Cloud Nine Waterproofing

Tiling in the Western Cape

Tiling gives floors and walls a durable finish when the base and details are suitable. A good plan considers moisture, movement and the way the tiled area meets its surroundings.

What tiling work involves

Floor tiling and wall tiling involve preparing a suitable base, setting out the layout and fixing tiles with an appropriate system. Grout and movement details form part of the finish, but they have different roles. Tile size, surface condition and the room's use all affect the work needed beneath the visible surface.

Tiles are a finish rather than a solution to every underlying defect. A moving base or unresolved leak can damage new work. In wet areas, suitable waterproofing and detailing need consideration before tiling; the tile face alone should not be treated as the waterproofing system.

Signs worth investigating

Cracked tiles, loose sections and grout that repeatedly opens can point to movement or problems underneath. Staining near wet areas may suggest moisture needs checking. A hollow sound alone does not explain the cause, so describe the wider pattern of damage. Note whether it started after a leak, impact or other work in the room.

How a tiling job typically goes

Tiling usually starts with checking the base and planning the layout, edges and cuts. Existing coverings may need removal, followed by repairs or levelling as appropriate. Waterproofing is considered where the area requires it. Tiles are fixed, then grouted after the required interval. Drying or curing periods and when the area can be used depend on the installation materials and conditions.

What affects the scope

Tile dimensions, patterns, room shape and the condition of the base influence the work. Floor levels, thresholds and fittings may require extra planning. Matching a damaged tile can be difficult if the original is no longer available. Ask whether removal, preparation, edge trims and any wet-area work are included, and clarify how the new surface will meet adjoining finishes.

Timing in the Western Cape

Winter dampness can affect preparation and drying, while summer heat can alter working conditions and the behaviour of installation materials. Exposed areas also face rain and wind. Plan the work around suitable conditions and material requirements, including time before use. Where a leak has affected the base, resolve the moisture source before closing the area with new tiles.

Your questions, answered

Can new tiles go over old tiles?
Sometimes, if the existing tiles and base are sound and the chosen system is suitable. Levels, adhesion, moisture and added weight need assessment before this approach is agreed.
Will regrouting fix a leak?
Not necessarily. Failed grout may be a symptom, and wet-area waterproofing can sit below the tiles. The source of moisture should be investigated before choosing a repair.
Can one cracked tile be replaced?
A local replacement may be possible if matching material is available and the base is sound. Repeated cracks can indicate an underlying issue that also needs attention.
When can I use the newly tiled area?
That depends on the fixing and grouting materials, room conditions and intended use. Discuss the required waiting periods before planning furniture placement or normal use of the area.

Tell us what your home needs

Share your floor or wall tiling plans in the home page form. Choose Tiles and describe the existing surface, damage and any wet areas so the scope can be discussed.

Request a quote